Left Wing - Tank, Rigging, flap gap, Pitot May 6, 2026 Left Wing - Tank, Rigging, flap gap, Pitot Mounted the tank and rigging for ailerons and flaps. Fitted and began riveting flap/aileron gap seals. Mounted Pitot controller to inspection place. Ran wire conduit.