Tailcone

Began rough assemble of tailbone and bulkheads. Match drilled 3 stiffeners and lined up three additional stiffeners with the right side skin to prepare for match drilling. Autumn assisted with match drilling and clecos

Participants

  • Jeff Peters (5400.0h)
  • Autumn Peters (3600.0h)

Photos