Tailcone
Tailcone
Began rough assemble of tailbone and bulkheads. Match drilled 3 stiffeners and lined up three additional stiffeners with the right side skin to prepare for match drilling. Autumn assisted with match drilling and clecos
Participants
- Jeff Peters (5400.0h)
- Autumn Peters (3600.0h)
Photos



