Elevators and Trim tab
Elevators and Trim tab
Completed the left elevator riveting and worked on both trailing edges of both elevators. Completed foam ribs using tank seal and trailing edges also using tank seal. Set aside to allow curing before i’ll rivet trailing edges.
Started final assembly of right trim tab including foam ribs with tank seal and riveting spar. Set aside for curing.
Photos



